October 26, 2007 – Hog Barn Progress

Another current project is the hog barn renovation.  About 2/3 of the roof is now up.  I’d like to finish painting the upper floor and get the remaining 2nd level windows in and roof on this week.


Following that, but not as urgently, is to paint the right hand side of the lower level and replace those two windows.  The left side will be reconfigured to be a “porch” of sorts.  The outer wall will be torn out and a new wall built what is now “inside” so animals will be able to get out of the sun and under the porch on this southern exposure from the outside.  That way if the barn door should get shut by the wind during the day, the animals will have a place to go for shelter. 