It’s not often December 30th brings 50 degrees – we used the opportunity to get a start on some work that is usually done in late March or early April – pulling up and putting in fence. We’re moving the entire line of fence on the north side out another 10 feet so we can plant another row of trees in the north windbreak/Christmas Tree patch.
Here’s Marty working the post puller. It was actually so wet, that we didn’t need this – the posts could just be pulled out.
There’s something about working in a warm rain – I’m not sure it reminds me of camping, or if the rain provides a slight sense of urgency to get done before the rain increases. It was not unpleasant and good to get out.