December 19, 2010 – The Windspire that Never Was

Many of you may have recalled that I won a grant to become a “small wind demonstration site” to compare two different styles of turbines at the same location. The idea was simple – publish production data from two different turbines so potential purchasers might have some data other than the manufacturer’s claims.

So, I put down the money for the Mariah Power Windspire turbine last November (as in 13 months ago). The turbine was supposed to arrive in 2-3 weeks. It didn’t. It was scheduled to go up in the spring. Spring moved into summer and every scheduled date never panned out – due to manufacturing delays.

After the fall date came and went and still no turbine, I decided that it probably wasn’t going to happen and that I should try to get my deposit of half the cost back. Eventually, they refund came and it looks like the checks have cleared.

Now, we have to figure out how to give grant money back – evidently something the University’s accounting system isn’t set up to do!