If you're not living on the edge, you're taking up too much room!

Calendar

mark check box to restrict search to high hopes blog only

May 21, 2008

May 21, 2008 - Final Connections for Skystream

Filed under: Farm - All, Wind Turbine — highhopesgardens @ 4:20 am

Nothing nearly as exciting as yesterday’s tower raising tody.

Making the trench to run the underground wire from the tower to the utility pole.

The trench from the utility pole and along the shed.

The other half of the trench. I’m including these more for my own records so years from now I won’t have to say “Now where did that underground wire go when there is more building or trenching on the farm.

Unrolling the wire along the path.

Todd’s working on the prep work for the connections at the base of the tower.

Local master electrician installing the connections on the utility pole.

A new meter reading 0!

one year ago…”Walkin’ the Dogs Down a Country Road”

• • •
Powered by WordPress |•| Wordpress Themes by priss