March 8, 2006 – Attic Update

Attic progress is slow but steady. It seems to require an inordinate amount of time laying on the back close to where the roof meets the floor.

Disclosure: I have not spent the most time on the floor – Chief engineer Smith gets that honor.
The roof strengthening/adding space for insulation is almost done on one side. The non-amended part is where the new dormer will go up.